For those planning a partial bath (22%) or kitchen (22%) remodel, the survey found:
Items planned for a partial bath remodel Items planned for a partial kitchen remodel 
1. Painting walls/ceiling67%1. Countertops69%
2. Flooring55%2. Backsplash55%
3. Faucets54%3. Flooring 50%
4. Sinks51%4. Painting walls/ceiling49%
5. Lighting 45%5. Sinks43%
6. Countertops40%6. Faucets 41%
7. Tub/shower38%7. Appliances38%
8. Towel bars/hardware34%8. Lighting35%
9. Wall/backsplash tile33%9. Painting cabinetry34%
10. New cabinetry32%10. New cabinetry29%

Source: BHG